VSG Maintenance Group
Wednesday December 14
I still lack some cabinet work in the bathroom. And installing the shower walls. And the gas line. Next project is a bathroom in the shop in the woods. Motivation is a factor. Some days I feel success if I get out of bed and brush my teeth in the same day. Finishing up a project always energizes me.
HW=362(6/14) SW=314(9/14) GW=195 CW=270 (1-26-2020)
VSG on 03/28/16
I think it is fantastic! Such talent!
Liz 5'3" HW: 219 SW: 185 GW: 125 LW: 113 Desired maintenance range: 120-125 CW: 119ish